Journey Time Reliability and Network Monitoring |
Highways Agency |
Jun 2006 |
Keeping Welsh economy moving FTA Welcomes Freight Strategy |
MHW Magazine |
May 2008 |
KomFram:Real-time public transport information system |
LEDA |
Feb 2000 |
LEDA Case Study City: Gothenburg |
LEDA |
Feb 2000 |
LEDA Case Study City: Madrid, Spain |
LEDA |
|
LEDA Measure: Bus Lanes |
The Municipality |
|
LEDA Measure: Bus/HOV lane in an urban corridor |
Ministry of Public Works and Transport |
|
LEDA Measure: Cordon Pricing |
LEDA |
Feb 2000 |
Lessons Learned from the Irvine Integrated Freeway Ramp Metering / Arterial Adaptive Signal Control Field Operational Test |
Institute of Transportation Studies, University of California, Irvine |
Dec 2000 |
London Congestion Pricing: Implications for Other Cities |
Victoria Transport Policy Institute |
May 2005 |
Lorries banned from overtaking to cut congestion on to three miles of the northbound M42 in Warwickshire |
Highways Agency |
Oct 2005 |
M! Junctions 7 - 10 High Occupancy Vehicle Lane |
Highways Agency |
Jun 2006 |
M-30 Madrid Calle 30 Project, Madrid, Spain |
Road Traffic Technology |
|
M1 Jct 6a to 10 Widening |
Highways Agency |
|
M25 Controlled Motorways Summary Report |
Highways Agency |
Nov 2004 |
M42 Active Traffic Management Pilot Project |
Highways Agency |
|
M42 Active Traffic Management Results - First Six Months |
Highways Agency |
Oct 2007 |
M5 Junctions 19 to 20 Pilot Scheme - Advisory Restrictions for Towing Vehicles |
Highways Agency |
|
M6 Major Roadworks Birmingham - Walsall Potholes Phase 2 |
Highways Agency |
Jun 2005 |
M6 Tool: How do I use it? |
M6Toll |
|