City:
Bodegraven-Woerden
Facilities:
A12
Facility Type:
motorways
Length of Controlled Section:
14 km test for the shock wave solving algorithm (SPECIALIST)
Objectives:
increase safety during bad weather conditions (rain, snow) and increase efficiency and reliability during peaks by reducing the maximum speed,
Date Implemented:
9-Sep
Other Information:
Part of the Dynamax test programme